postra-mi-sched.ll
958 Bytes
; RUN: llc < %s -O3 -mtriple=aarch64-eabi -mcpu=cortex-a53 | FileCheck %s
; With cortex-a53, each of fmul and fcvt have latency of 6 cycles. After the
; pre-RA MI scheduler, fmul, fcvt and fdiv will be consecutive. The top-down
; post-RA MI scheduler will clean this up.
@d1 = common global double 0.000000e+00, align 8
define i32 @test1(float %s2, float %s3, double %d, i32 %i2, i32 %i3) {
entry:
; CHECK-LABEL: @test1
; CHECK: fmul
; CHECK-NEXT: add
; CHECK: fcvt
; CHECK-NEXT: mul
%mul = fmul float %s2, %s3
%conv = fpext float %mul to double
%div = fdiv double %d, %conv
store double %div, double* @d1, align 8
%factor = shl i32 %i3, 1
%add1 = add i32 %i2, 4
%add2 = add i32 %add1, %factor
%add3 = add nsw i32 %add2, %i2
%add4 = add nsw i32 %add3, %add2
%mul5 = mul i32 %add3, %add3
%mul6 = mul i32 %mul5, %add4
%mul7 = shl i32 %add4, 1
%factor18 = mul i32 %mul7, %mul6
%add9 = add i32 %factor18, %mul6
ret i32 %add9
}